Administrative
Re-Engineering - The Thrust |
Detailed system Study (DSS) Specifications | Recommended Documents for IT Plan |
| RECOMMENDED DOCUMENTS FOR IT
PLAN |
4.1 Document on Existing
Processes - This document shall be the first document giving the mission, purpose,
objectives, organizational hierarchy, detail of subordinate offices and the functions of
the Department/Board/Corporation. It will
also cover the information flow and the IOU Diagram. This document will also cover the
problem areas and pitfalls in the existing system. 4.2 Document on Re-engineering
- This document will cover the re-engineering needs of the organization on the basis of
information flow, the periodicity, the problem areas and the automation needs of the
Department. This document will be prepared on
the basis of the functional classification, guiding principles, the approaches and the
methodology given for carrying out the Comprehensive Critical Cyber Re-engineering as
mentioned in this bulletin. 4.3 Detail Systems Study
Document 4.3.1
Functional
Information Systems Document - This document shall specify all the Functional
Information Systems to be taken up in a phased manner.
The grouping of various activities and functions shall be carried out to identify
the Functional Information System. It will
give all the inputs and outputs along with their formats.
Also, the prioritisation of applications on
the basis of public interface and transaction automation shall be spelt out in this
document. 4.3.2
Database
and Data Warehousing Needs Document - This document
will cover the database and data warehousing requirements of the
Department/Board/Corporation for various phases. The
underlying objective is to evolve the storage and processing model to ascertain the
hardware sizing. This document will contain
all the data base requirements pertaining to various Functional Information Systems. 4.3.3
Networking
Needs document - On the basis of
the data base requirements and the data flow between various offices along with their
periodicity will evolve the communication and networking requirements within the
Department and with other Departments.
4.3.4
Hardware
and Software Requierments- This document will
list down the hardware and system software specifications for implementing the project.
Also, the networking equipments required shall be covered in this document. This will give
the break up of the likely cost in various phases.
4.3.5
Project
Cost Document - The manpower
requirements as well as the cost on various project components shall be summed up in this
document. This will give the cost to be incurred in various phases. FDs Comments
as given below may kindly be incorporated while preparing the IT Plan: FD has seen the
amended guidelines. It is observed that AD has recommended procurement of IT Products on
the basis of limited tenders/quotations. It is suggested that instead of limited
tenders/quotations, the guidelines should incorporate Open Tendering process as per the
instructions issued by the Supplies and Disposal Department in the matter. AD should also
ensure that the suggested procurement is as per the IT Policy approved by CMM.